
Beginning Monday, March 26th, Brady St will have lane reduction in the left lane in two locations: between River Dr and 2nd St, and between 3rd and 4th Streets. Also, 4th St will have a lane reduction in the right lane between Perry and Brady Streets. Work should be complete by Monday, April 2nd.
Refer to the map provided for details.
The Redstone Ramp will not be accessible from Brady St during this time.